1 Building Order with a Project-Specific Cubicle Count
The minimum building order is 1 unit. A sanitary block can combine toilets and washbasins, with showers included only where specified. The selected layout establishes cubicle count and dimensions.
Provide the expected use pattern, water supply and wastewater connection. Plan access to fixtures and service components before the block layout is approved.
Compare the Proposed Layout with a 4-WC Block Reference
| Comparison point | Longtai multi-stall block | PQSE House — 20ft steel-frame toilet block |
|---|---|---|
| Fixtures | By selected project layout | Reference: 4 WCs and 4 washbasins |
| External dimensions | By approved drawing | 5,950 × 3,000 × 2,800 mm |
| Wall system | By material schedule | 50 mm rock wool; 0.4 mm steel skins |
Competitor sources: PQSE House 20ft steel-frame toilet block. Values are supplier-published specifications, not independent test results. The named configurations and supply scopes differ.
For a camp layout, use the camp sanitation planning page to define toilets, showers, water supply and drainage responsibilities.
3-Year Online Warranty and After-Sales Support
Longtai provides 3-year online warranty and after-sales support under the agreed order terms. Confirmed product-issue replacement parts are supplied free with the next order under the agreed arrangement.
Keep the fixture, valve and connection schedule with the block records. The agreed scope should distinguish supplied components from site utilities and routine servicing. On-site work and urgent freight require a separate agreement.
Frequently asked questions
How many toilet cubicles are included in a Longtai multi-stall sanitary block?
The minimum building order is 1 unit, while its cubicle count follows the selected layout. Provide the required toilets, washbasins and showers. The quotation must identify the actual fixture schedule.
Can toilets and showers be combined in the same modular sanitary block?
Optional showers can be included in the project layout. Coordinate privacy, circulation, water, hot-water provision, drainage and maintenance access before confirming the arrangement.
Does the sanitary block arrive ready to use without site connections?
The required site work depends on the agreed scope. Confirm water, wastewater, electrical and any hot-water connections and identify who completes and checks them before use.



