For the standard Longtai 5950 × 3000 × 2800 mm detachable unit, plan approximately four hours with two to three installers. No crane is required for assembly of that standard unit. These figures describe the unit assembly task, not the complete preparation and handover of an accommodation site.
What the assembly reference does and does not cover
| Activity | Planning basis |
|---|---|
| Standard unit assembly | Approximately four hours with 2–3 installers, following the matching instructions. |
| Foundations and anchoring | Confirm the site and approved support details separately. |
| Unloading and component handling | Plan access, equipment and storage for the delivered packages. |
| Electrical and plumbing connections | Separate site activities and supply-scope decisions. |
| Joined or stacked buildings | Project-specific connections, lifting, stairs and installation sequence. |
Before the components arrive
- Confirm the drawing revision. Check the external dimensions, openings, partitions and any combined-unit details against the purchase order.
- Prepare the site. Arrange the approved foundation and support points, access and working space before starting assembly.
- Prepare the crew and tools. Use the tool and safety requirements in the matching installation documentation. Do not substitute the standard unit’s no-crane statement for an unloading or multi-storey lifting plan.
- Check the materials. Compare quantities and component identification with the packing list. Keep panels and fittings organized and protect them during storage.
Main installation stages
The illustrated reference explains the frame, floor, walls, openings and roof assembly. Use it together with the order-specific drawings; it is not a substitute for a site-specific installation plan.
- Lay out the components and establish the required base position.
- Assemble the lower frame and supporting members in the specified sequence.
- Install columns and upper-frame members, checking alignment before enclosure work.
- Fit floor boards, wall panels, doors and windows according to the opening plan.
- Complete the roof, ceiling and specified sealing details.
- Review connections, finishes and completeness against the agreed drawing and material list.
Some panels may require site cutting according to the installation reference. Confirm cutting locations and dimensions against the selected model before work; do not infer them from a photograph of a different layout.
How options affect the schedule
Extra partitions, glazing, bathrooms, kitchens, electrical work and decorative finishes add tasks beyond the basic unit. Multiple levels also change access and lifting requirements. Give the installation team the complete scope rather than multiplying the four-hour reference by the number of rooms and treating it as a guaranteed completion date.
Get the correct documents and support
The resource library provides an illustrated installation reference, a standard material sheet and other planning documents. Lighter PDFs are available for browsing, while high-resolution originals remain accessible. Confirm that the instructions correspond to your ordered configuration.
For additional construction details, explore the quick-assembly modular housing reference atlas. Read its source and scope notes, and confirm the applicable details against the approved drawings for your order.
Longtai offers online installation guidance and three-year online warranty support. Share the model, drawing revision, photographs and a clear description when requesting assistance. Discuss your installation requirements before placing the order.