18 Sets per 40HQ: Planning a Standard Detachable Container House Shipment

Understand the 18-set loading reference for Longtai standard detachable units, quantity calculations and the details that change a shipping plan.

Detachable house components during container loading

A 40HQ can hold 18 sets of Longtai’s standard 5950 × 3000 × 2800 mm detachable container house. This is a packing reference for the confirmed standard component configuration. It is not a loading figure for every house in our catalog.

What is being loaded?

The building dimensions describe the assembled unit. A detachable house travels as components: frame members, wall panels, floor boards, roof and ceiling sheets, doors, windows and assembly accessories. It is not shipped as eighteen fully assembled rooms. The material list and packing list should therefore be read together.

Use the standard detachable product page to review the current baseline and download its specification. Check the revision quoted for your order, especially when comparing brochures with different frame, floor or opening specifications.

A simple shipment estimate

Standard sets Calculation at 18 sets per 40HQ Planning interpretation
18 18 ÷ 18 = 1 One full standard reference load.
36 36 ÷ 18 = 2 Two reference loads, subject to the final packing list.
90 90 ÷ 18 = 5 Five reference loads; this is a calculation, not evidence of an actual shipment.
20 18 plus 2 sets Discuss the remaining sets and shipment method; do not assume a fixed freight price.

For a preliminary count, divide the order quantity by eighteen and round up if planning only full-container shipments. That arithmetic does not establish payload compliance, package dimensions, freight cost or the best method for a small remainder.

What can change the loading quantity?

  • Different building dimensions: longer components or different panel lengths change the packing arrangement.
  • Additional fit-out: sanitary equipment, electrical materials, furniture and other accessories need their own space and handling plan.
  • Combined buildings: stairs, walkways, connecting parts and additional roofing are not automatically covered by the standard unit count.
  • Mixed models: expandable, folding and flat pack foldable units have different transport formats.

What to confirm before booking transport

  1. Approve the model, quantity, material list and supplied accessories.
  2. Obtain the package count, dimensions, gross weights and loading proposal.
  3. Confirm the destination port, shipping responsibilities and handling requirements with the relevant parties.
  4. Plan unloading, dry storage and how components will reach the assembly area.
  5. Keep the final packing list and loading photographs with the order documents.

Factory production capacity does not fix a vessel departure or arrival date. Production, packing, booking and destination handling are separate parts of the schedule.

Send us your shipment brief

Provide your quantity, destination country and port, intended use and requested accessories. We can then review the loading plan for that configuration. Request a configuration and packing proposal, or review the 36-kit Surabaya distributor order, which records 36 kits for local resale in two 40HQ containers.

START A CONVERSATION

Let’s plan your next building project.

Tell us where you are building, what the space is for and how many units you need.

Request a Project Quote
Send Inquiry WhatsApp