Prefabricated building solutions, made for your project.
16624680807@163.comWhatsApp +8616624680807
Detachable Container Houses

Combined Container Office Building

Longtai configures combined detachable container offices from a project room schedule and site plan. Module quantity, storeys, connections, stairs and finishes are confirmed in the approved drawings. The building order minimum is 1 unit; a combined office requires the modules specified by its layout.

Model / Configuration: Project-specific modular combination
  • Combined detachable-module arrangement
  • Module quantity follows the room schedule
  • Stairs and circulation defined in project drawings

MOQ: 1 unit · Configuration and schedule confirmed with your quotation.

1-Unit Minimum; Combined Quantities Follow the Building Plan

Longtai accepts building orders from 1 unit, while a combined office needs the module quantity established by its room schedule. Define separate offices, meetings, staff work areas and circulation before selecting the arrangement.

The project drawings set the storeys, connections, stairs and overall dimensions. A photograph of a combined building does not determine the quantities for another site.

Compare a Combined Building with a 5,950 mm Reference Module

Comparison point Longtai combined office PQSE House — 20ft detachable reference module
Quotation basis Complete project arrangement Named reference module
Module dimensions By approved building design 5,950 × 3,000 × 2,800 mm
Room configuration Room schedule and circulation plan Open-plan detachable reference

Competitor sources: PQSE House 20ft detachable reference module. Values are supplier-published specifications, not independent test results. The named configurations and supply scopes differ.

If the combined rooms will be used for teaching, review the modular classroom and training-space brief before confirming room sizes and access.

3-Year Online Warranty and After-Sales Support

Longtai provides 3-year online warranty and after-sales support under the agreed order terms. Confirmed product-issue replacement parts are supplied free with the next order under the agreed arrangement.

Keep module identification, the connection drawings and the service schedule with the handover records so support can address the relevant part of the building. On-site work and urgent freight require a separate agreement.

Frequently asked questions

How many detachable modules do I need for a combined site office building?

The required quantity comes from the room schedule and site plan. Provide staff work areas, meeting rooms, service spaces and circulation requirements. A single module count cannot be quoted for every combined building.

Can the combined container office be arranged over two storeys?

A 2-storey arrangement requires project review. Foundations, connections, stairs and circulation must be defined in approved drawings before that arrangement is confirmed.

Do standard container kit prices cover a combined office building?

A standard kit price does not define the complete building price. Request a project quotation that identifies modules, connections, stairs, finishes, services and the work required at the destination.

REQUEST A CONFIGURATION

Request a quotation

You are inquiring about Combined Container Office Building. Share your destination, intended use and quantity for the quotation.

Prefer WhatsApp?

Have drawings or a bill of quantities? Send them by email or WhatsApp.

More configurations in this category

View all products
Send Inquiry WhatsApp