Product configuration references. Final dimensions, materials, fittings and included items are confirmed in the approved drawings and quotation.
Glazed elevations and opening windows
The glazed elevations show the interior through large fixed panels, with smaller top-hung sashes opening outward. Consider desk positions, screen glare, privacy and the approach to each entrance when developing the office layout. The selected drawing should set out the glazing divisions, opening positions and door clearances; glass type and performance are specified for the project.
External staircase and circulation
A white staircase with handrails runs outside the building to the upper level. Keeping the stair outside the enclosed rooms makes its approach and landing part of the site plan. Set out access to each floor together with the surrounding passageways, expected users and any accessibility requirements.
Panelled walls and interior fit-out
The panelled elevations include windows with external bars. Inside, the supplied view shows light-coloured wall panels, a grey floor, a ceiling-mounted light and visible electrical conduit and sockets. These details provide a starting point for an office fit-out schedule.
Develop the room plan around the work to be done: individual desks, shared work areas, a meeting space or reception. List the required furniture, partitions, lighting, socket positions, data connections and ventilation equipment in the quotation scope. The photographs do not define a complete electrical specification or a supplied furniture package.
Planning the two-storey configuration
Provide a site sketch with the available footprint, approach routes and intended use of each level. The project drawings should coordinate the supporting base, connections between levels, staircase and landing, glazing arrangement and services. Structural loads, local design requirements and the final materials are established for the selected project.
Packing, delivery and installation
Share the destination and site-access conditions, including unloading space and access for installation equipment. Confirm which components are supplied, how the glazing and staircase are packed, and who is responsible for the supporting base, assembly and service connections. Transport dimensions and the delivery programme follow the agreed configuration.
Request a quotation
Refer to Two-Storey Glazed Detachable Container Office with External Stair and include:
- The number of buildings and intended use of each floor
- Available footprint, preferred dimensions and a layout sketch
- Destination and installation-site conditions
- Required glazing, doors, windows, finishes and privacy provisions
- Stair access, room divisions and electrical or data requirements
- Target delivery date and unloading arrangements
FAQ: Two-Storey Glazed Detachable Container Office with External Stair
What building system does this office use?
This configuration uses detachable container construction. The selected project drawings define the arrangement of the two levels, the connections and the external staircase.
What size and floor layout are available?
The photographs show a two-storey arrangement, but do not establish its dimensions or a complete floor plan. Send the available footprint, intended use of each level and room requirements so these can be set out in the quotation and drawings.
What glazing and window specification is included?
The shown elevations combine fixed glazed panels with top-hung opening sashes. Glass type, glazing build-up, window dimensions and performance requirements are specified for the selected project and destination.
Are furniture and electrical services included?
The interior view shows a ceiling light, visible conduit and sockets in an unfurnished room. The quotation and bill of materials define the supplied furniture, lighting, wiring, power connections, ventilation equipment and other fit-out items.
What information is needed for a quotation?
Provide the quantity, destination, available site area, preferred dimensions and a sketch of both floors. Include staircase access, room uses, glazing and finish requirements, required services, target date and unloading conditions.



