Prefabricated building solutions, made for your project.
16624680807@163.comWhatsApp +8616624680807

RESOURCES & GUIDES

Container House Procurement Documents: From Drawings to Packing Lists

A practical checklist for matching container house drawings, material lists, certificates, packing documents and handover records to the order.

Page from Longtai standard detachable house specification showing the bill of materials.

Good procurement documents connect the appearance of a container house to what is actually ordered and supplied. Keep one agreed revision of the configuration and check later documents against it. This is especially useful when a product family includes multiple sizes, finishes and assembly formats.

Before approving a quotation

  • Configuration drawing: external dimensions, room plan, openings, fixtures and any joined modules.
  • Material list: frame, wall, roof, floor, door, window and accessory specifications.
  • Supply scope: included options, locally supplied items and the responsibilities for site works.
  • Schedule: drawing approval, production, packing and shipment milestones for the actual order.

Do not infer a complete specification from a photograph. Ask which visible finishes, furniture and equipment are included. Keep the quotation brief and all agreed changes with the final offer.

Check certificates by scope

Record the issuer, document number, holder name, issue date, listed models and referenced standards. A certificate covering a component or particular model should not be described as approval of every building configuration or every destination.

Longtai makes its available CE and RoHS documents accessible through the factory and company page, with an explanation of the former company name shown on those files. Match the applicable document to the offered model and request clarification where the model codes differ. Destination-specific acceptance remains a separate project question.

Before shipment

Document or record What to compare
Final packing list Order reference, component quantities, package identification and weights or dimensions where applicable.
Loading proposal Selected model, supplied accessories and agreed shipment format.
Production and packing photographs Whether the photographs belong to the actual order and show the agreed configuration.
Shipping documents Consistent company, destination, shipment and goods information, reviewed with the responsible logistics parties.

The standard detachable reference of 18 sets per 40HQ supports preliminary planning. The final loading proposal and shipment records are the evidence for a particular consignment.

Prepare the site handover

Provide the installation team with the matching assembly instructions, approved drawings and packing list. Confirm foundation, anchoring, handling equipment and utility responsibilities. Keep contact details for online support and record any missing or damaged items with clear photographs and package identification.

Use one order record

A simple folder can contain the quotation, drawing revision, material list, document review, packing list and handover photographs. Record the date and purpose of each revision instead of overwriting earlier approvals. This helps the buyer, supplier and installation team discuss the same configuration.

Request documents for your selected model. Include the product link, intended use, destination and any project specification so the response can be matched to your order.

START A CONVERSATION

Let’s plan your next building project.

Tell us where you are building, what the space is for and how many units you need.

Request a Project Quote
Send Inquiry WhatsApp