
A useful container house quotation explains both the configuration and its boundaries. Two offers with the same room dimensions can include different materials, fittings, packing or services. Compare the written supply scope before comparing a unit price.
Start with one defined building configuration
Longtai’s standard detachable unit has external dimensions of 5950 × 3000 × 2800 mm. Its current material list includes the frame, wall panels, floor, roof, ceiling, one steel door, two windows and listed assembly accessories. The list is the baseline for a discussion; the agreed quotation and drawings define the order.
Confirm frame and panel specifications, roof and ceiling sheets, floor boards, opening sizes and included fasteners. A photograph helps explain appearance but does not establish the exact supplied materials.
Separate the cost into clear groups
| Cost group | What to request |
|---|---|
| Building kit | Model, dimensions, quantity, material list and included accessories. |
| Optional fit-out | Partitions, electrical items, sanitary fixtures, kitchen, furniture and decorative finishes. |
| Project additions | Stairs, corridors, connecting pieces, extra roofing and any combined-building requirements. |
| Packing and transport | Packing plan, destination, shipment method and the delivery responsibilities covered by the offer. |
| Site work | Foundations, access, unloading, anchoring, utility connections and local assembly responsibilities. |
Electrical fit-out, plumbing, kitchens, furniture and foundation work are not listed as included in the standard material list. If you need them, identify each item in the inquiry and have its inclusion or exclusion recorded in the offer.
Do not confuse assembly time with total site time
The reference for one standard unit is approximately four hours with two to three installers, without a crane for the unit assembly itself. That does not include foundations, unloading, utility connections or stacked-building work. A full accommodation site also needs circulation, service facilities and a coordinated construction sequence.
Compare shipping on the same basis
The confirmed standard packing reference is 18 sets per 40HQ. Extra equipment and mixed models can change it. Ask each supplier to state what transport and destination costs are included, and confirm any remaining costs with your logistics providers. We do not publish a universal freight rate because quantities, ports and shipment arrangements differ.
A practical comparison checklist
- Are both offers based on the same approved drawing and material list?
- Are quantities and optional items itemized?
- Are packing, delivery responsibilities and target dates stated?
- Who provides the foundation, tools, lifting equipment and site connections?
- What documents and inspection photographs are included in the handover?
- Are warranty support and replacement-part arrangements written clearly?
Longtai provides three-year online warranty and after-sales support. For product issues, required replacement parts are supplied free with the next order; confirm coverage and any separate shipping arrangements in the agreement.
Prepare a complete quotation request with your destination, quantity, layout and target schedule, then send it to Longtai.