Prefabricated building solutions, made for your project.
16624680807@163.comWhatsApp +8616624680807

RESOURCES & GUIDES

Planning Worker Accommodation with Container Houses

Prepare a worker accommodation brief covering rooms, shared facilities, circulation, delivery and the building configurations required for your project.

Two-story modular building with an external stair and upper terrace.

A worker camp begins with people and daily activities. The number of units is an output of the room and site plan, not a substitute for it. Before choosing individual container houses, prepare a short accommodation brief covering sleeping rooms, sanitation, shared facilities and circulation.

Start with a room schedule

Space Information to provide
Sleeping rooms Total occupants, intended occupants per room, beds, storage and shift patterns.
Sanitary facilities Toilets, showers, washbasins, water supply, drainage and any hot-water requirements.
Shared spaces Dining, kitchen, laundry, recreation or other facilities needed by the project.
Management and support Office, reception, first-aid or storage requirements where included in the brief.
Circulation Entrances, corridors, stairs, walkways and access for operation and maintenance.

State your intended room occupancy and have the layout assessed against the applicable project requirements. A room photograph does not establish an approved occupancy, ventilation rate or evacuation arrangement.

Select the building system around the site

Detachable units arrive as components for assembly. Flat pack foldable configurations have their own model-specific packing and assembly arrangements. Expandable units offer a larger unfolded footprint, while K-type buildings are specified from a complete building layout. Review the assembly method and site access alongside room dimensions.

For a two- or three-storey proposal, confirm structural connections, foundations, stairs, corridors and installation equipment. Do not assume a single-unit specification automatically approves a multi-storey building.

Write a responsibility schedule

Assign responsibility for foundations, anchoring, unloading, assembly, electrical supply, water and drainage connections. List the interior fixtures and furniture included in the supplier’s scope and those sourced locally. This makes quotations easier to compare and helps prevent missing tasks at site.

Plan delivery in usable stages

Discuss the quantity needed for each stage, the storage area and the order in which the camp becomes operational. The standard detachable reference is 18 sets per 40HQ, but stairs, extra roof structures and sanitary equipment need their own packing review. Confirm the overall order plan before translating unit counts into shipping-container counts.

A documented order example

Longtai’s Surabaya distributor order records 36 detachable kits for local resale, packed in two 40HQ containers with 18 sets each. This loading record does not establish worker occupancy or a completed accommodation project.

Questions to settle before requesting a camp quotation

How do worker numbers become a building quantity?

Start with the peak number of people to be accommodated in each project phase and the proposed occupants per sleeping room. Round up the sleeping-room count, then add the sanitary, dining, office and other spaces in the room schedule. Have the proposed occupancy and layout reviewed for the project. A sleeping room is not automatically equivalent to one container unit; the model and combined layout determine the final unit quantity.

Does the delivery date mean the camp is ready to occupy?

Clarify whether each date refers to factory completion, shipment, arrival at the port, site delivery or readiness for use. Work backwards from the required occupancy date to allow for unloading, foundations, assembly, service connections and the checks required for the project. Assign each step to the supplier or local project team in the responsibility schedule.

How can two camp quotations be compared fairly?

Send both suppliers the same room schedule, destination, material requirements and supply boundaries. Compare the complete project scope, including stairs, corridors, sanitary fixtures, furniture, packing, freight and site work where required. Identify any excluded items before comparing totals.

For the next step, compare container house supply formats and review the drawings and procurement documents to request with your quotation.

Send a brief that can be quoted

Include destination and port, number of workers, room schedule, site dimensions, preferred storeys, services and target dates. Attach any available layout and specify what local works are already arranged. Explore the accommodation application and request a project configuration.

START A CONVERSATION

Let’s plan your next building project.

Tell us where you are building, what the space is for and how many units you need.

Request a Project Quote
Send Inquiry WhatsApp